A long day running before the wind timed to reach Spurn Head at low water and then cross the shipping channel and take the flooding tide up the Humber to Grimsby.
Passing Flamborough Head
Passing wind farm off Withernsea
Crossing busy shipping channel into the Humber
Approaching Grimsby with lights of chemical industry near Hull to right
Easy finding the docks as head for the huge Grimsby Dock Tower that was built to hydraulically power the lock
67 nautical miles